Abstrak
The density of activities that take place around the operating facilities at Andi Djemma Masamba Airport so that the Management of the Andi Jemma Airport Operator Unit (UPBU) Office has launched the development of Andi Djemma Masamba Airport as an aviation company so that it continues to carry out various facility improvements, especially in risk prevention with potential activities with high losses, therefore it is necessary to conduct research to find out how to map, risk assessment and design a risk control and mitigation system at the Operations facility at Andi Djemma Masamba Airport caused by activities that have the potential to cause risk. The stages of the risk management process refer to ISO 31000: 2018 including risk identification, risk analysis and risk evaluation. Expected impact and likelihood of occurrence are mapped through the risk matrix from the Federation Aviation Administration (FAA). The results showed that at the andi djemma masamba airport there were 6 events that fell into the red category, namely Aircraft accidents during take off/landing, Aircraft accidents in the apron area, Escape of dangerous goods into the aircraft, Fuel Spills on the Apron/Taxiway, Lack of building maintenance, The security inspection process is less than optimal.
Referensi
Anita A. & Taufik I., (2021).Analisis Manajemen Risiko Dengan Penerapan ISO 31000 Pada Proses Machining (Studi Kasus: Perusahaan AB)
Cahayani A. & Arif F. (2022). Evaluasi Penerapan Sistem Manajemen Keselamatan (Safety Management System) Terhadap Sumber Daya Manusia Unit Safet Management System di Bandar Udara Sultan Muhammad Kaharudin
Dayu, A. & Desiana R.,(2022). Analisis Implementasi Manajemen Risiko Operasional Runway Pt Angkasa Pura I Bandar Udara Internasional Juanda Surabaya Jawa Timur
Debrina P. & Amalia D., (2016). Analisis Penerapan Manajemen Risiko Berdasarkan ISO 31000 pada proyek Konstruksi Pengembangan Fasilitas Gas .
Hendarwan, D. (2022). Penerapan ManajemenRisiko (Risk Management) DenganPendekatan ISO 31000:2018 Dalam Pelaksanaan Strategi Perusahaan. Jurnal Adminika, 8(1), 58–73.
Herliyanto, T. (2019). Perencanaan dan Perancangan Bandar Udara. Bandung: Penerbit ITB
Heriawan, A., & Saputra, R. (2018). Evaluasi Risiko pada Manajemen Bandar Udara dengan Pendekatan Risk matrix. Jurnal Ilmiah Teknik Industri, 17(1), 34-41.
Izami, F. N. (2022). Implementasi Pengendalian Risiko untuk Meminimalisasi Kerugian. Jurnal Riset Mahasiswa Ekonomi (RITMIK), 4(2), 62–74.
Janna, N. M., & Herianto. (2021). Konsep Uji Validasi dan Realibilitas Dengan Menggunakan SPSS. Jurnal Darul Dakwah Wal-Irsyad (DDI), (18210047), 12.
Lanin, I. (2018). Standar Baru Manajemen Risiko ISO 31000:2018. (Vol. 15, pp. 104–116).
Mardi Setiawan, P. P. (2017). Implementasi Pengendalian Risiko Terhadap Kecelakaan Kerja Pada Landasan Helikopter. Journal of Chemical Information and Modeling, 53(9), 1689–1699.
Nugrahani, F., & Hum, M. (2014).Metode penelitian kualitatif. Solo: Cakra Books, 1(1), 3-4.
Nurcahyani, R., & Setiawan, A. (2019). Evaluasi Risiko pada Manajemen Keamanan Bandar Udara. Jurnal Teknik Sipil, 6(2), 97-105.
Pradana, I. K., & Imbar, R. (2018). Analisis Risiko Implementasi ISO 31000:2018 pada Proyek Konstruksi Jalan Raya. Jurnal Ilmiah Teknik Industri, 17(1), 60-66.
Pramudito, A., & Nugroho, A. (2019). Analisis Risiko pada Pengembangan Infrastruktur Bandar Udara. Jurnal Rekayasa Sistem Industri, 8(1), 1-7.
Rahajaan, M., Gafi, M. G. A., Supardi, S., & Bachmid, S. (2019). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Gedung (Studi Kasus: Pembangunan RSIA Ananda Kota Makassar). Jurnal Ilmiah Mahasiswa Teknik Sipil, 1, 363–371
Sutopo, H. B. (2017). Metode Penelitian Kualitatif: Dasar Teori dan Terapannya dalam Penelitian. Surakarta: UNS Press.
Suroso, I. (2020). Karakteristik Brake Lining Pada Pesawat Cessna Type 208b. Teknika STTKD: Jurnal Teknik, Elektronik, Engine, 6(1), 17–24.
Sutisna, icam. (2020). Statistika penelitian. Universitas Negeri Gorontalo, 1(1), 1–15.
Authors who publish in PENA TEKNIK: Jurnal Ilmiah Ilmu-ilmu Teknik agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
